FERTILIZER MANUFACTURING FACILITY (ENERGY/ CHEMICAL)
- 619 Acre Greenfield Site
- Land and Infrastructure Project Development
- Production Water, Industry Rail, Natural Gas Pipeline
- Road, Bridge, Power, and Substations
- $1.5 Billion +
4000 MT POLYSILICON MANUFACTURING FACILITY (ENERGY/CHEMICAL)
- 68 Acre Greenfield Site / 35,400 CY Concrete / 9,488 T Steel / 246,894 LF Piping
- Project Development, Design, and Construction Management
- 2500 CY Concrete Placement Video
- $690,000,000
RAIL YARD INDUSTRIAL WASTEWATER AND FUEL SUPPLY TRANSFER
- Greenfield Industrial dissolved air flotation separator wastewater treatment facility
- 2 Mile underground locomotive diesel fuel supply transfer pipeline and pump skid
- Demolition of 53 yr. old industrial wastewater treatment facility
- Construction Management / SWPPP Management
- $7M
ADA RETROFIT PROJECT
- 22 Healthcare Buildings
- Hospital / Medical Office Building (OSHPD, JCAHO)
- Site and Interior Work
- $26,100,000
6.5 MW CAMPUS BACKUP ELECTRICAL SYSTEMS
- Back-up Power for 27 Acre Life Sciences GMP Manufacturing Site
- Western US Energy Crisis of 2000/2001
- Project Development, Design, and Construction Management
- $676,000
GMP FINISHED PHARMACEUTICAL LAB AND CLEANROOMS
- 9000 sq. ft.
- Cat. 3 Potent Compound
- Class 10k Clean Rooms & GMP Analytical QC Lab
- $2,936,000
IT NETWORK INFRASTRUCTURE
- Information Management System Upgrades
- Supporting Space-Electrical-UPS-HVAC Upgrades
- 64 Healthcare Locations (OSHPD / JCAHO)
- $9,300,000
INTEGRATED MEDICAL IMAGING SYSTEMS (NETWORKED)
- 13 Buildings, 46 Locations
- Hospital / Medical Office Building (OSHPD, JCAHO)
- Infrastructure Upgrades, Digital Radiology Equipment Installations
- Operating Room X-Ray Viewing
- $16,900,000
AUTOMATED MEDICAL RECORDS
- 25 Buildings, 1600 Wired & Wireless Exam/Bedside Work Stations
- Supporting Telecom / Network Infrastructure Upgrades
- Hospital / Medical Office Building (OSHPD, JCAHO)
- $13,200,000
5 STORY MEDICAL OFFICE BUILDING
- HVAC Replacement
- 125,000 CFM in AHU’s, 110,000 CFM in EF’s
- 1800 Tons Ice Storage, 250 Tons Chilled Water
- Two 15hp Cooling Towers
- $3,200,000