Projects

FERTILIZER MANUFACTURING FACILITY (ENERGY/ CHEMICAL)

  • 619 Acre Greenfield Site
  • Land and Infrastructure Project Development
    • Production Water, Industry Rail, Natural Gas Pipeline
    • Road, Bridge, Power, and Substations
  • $1.5 Billion +

4000 MT POLYSILICON MANUFACTURING FACILITY (ENERGY/CHEMICAL)

  • 68 Acre Greenfield Site / 35,400 CY Concrete / 9,488 T Steel / 246,894 LF Piping
  • Project Development, Design, and Construction Management
  • 2500 CY Concrete Placement Video
  • $690,000,000

RAIL YARD INDUSTRIAL WASTEWATER AND FUEL SUPPLY TRANSFER

  • Greenfield Industrial dissolved air flotation separator wastewater treatment facility
  • 2 Mile underground locomotive diesel fuel supply transfer pipeline and pump skid
  • Demolition of 53 yr. old industrial wastewater treatment facility
  • Construction Management / SWPPP Management
  • $7M

ADA RETROFIT PROJECT

  • 22 Healthcare Buildings
  • Hospital / Medical Office Building (OSHPD, JCAHO)
  • Site and Interior Work
  • $26,100,000

6.5 MW CAMPUS BACKUP ELECTRICAL SYSTEMS

  • Back-up Power for 27 Acre Life Sciences GMP Manufacturing Site
  • Western US Energy Crisis of 2000/2001
  • Project Development, Design, and Construction Management
  • $676,000

GMP FINISHED PHARMACEUTICAL LAB AND CLEANROOMS

  • 9000 sq. ft.
  • Cat. 3 Potent Compound
  • Class 10k Clean Rooms & GMP Analytical QC Lab
  • $2,936,000

IT NETWORK INFRASTRUCTURE

  • Information Management System Upgrades
  • Supporting Space-Electrical-UPS-HVAC Upgrades
  • 64 Healthcare Locations (OSHPD / JCAHO)
  • $9,300,000

INTEGRATED MEDICAL IMAGING SYSTEMS (NETWORKED)

  • 13 Buildings, 46 Locations
  • Hospital / Medical Office Building (OSHPD, JCAHO)
  • Infrastructure Upgrades, Digital Radiology Equipment Installations
  • Operating Room X-Ray Viewing
  • $16,900,000

AUTOMATED MEDICAL RECORDS

  • 25 Buildings, 1600 Wired & Wireless Exam/Bedside Work Stations
  • Supporting Telecom / Network Infrastructure Upgrades
  • Hospital / Medical Office Building (OSHPD, JCAHO)
  • $13,200,000

5 STORY MEDICAL OFFICE BUILDING

  • HVAC Replacement
  • 125,000 CFM in AHU’s, 110,000 CFM in EF’s
  • 1800 Tons Ice Storage, 250 Tons Chilled Water
  • Two 15hp Cooling Towers
  • $3,200,000